Paddington Village Infrastructure

Along with Morgan Sindall and Liverpool City Council, VIS Systems worked to keep their works at Paddington Village as safe and secure as possible.

Client
Period
2015–2024
Value
£200m+

During the construction of the mixed use development forming part of Liverpool’s Mayor designated Development Zone, also known as the Knowledge Quarter, the construction process required the assistance from top of the range security for such a large project.

VIS Systems helped to keep the site of Paddington Village safe and secure with a range of services and products.

With such a vast space being covered, the ‘Infrastructure and Public Realm’ (I&PR) was a complex and crucial civil engineering project created to remodel the land to form the serviceable building plots; thus, it is clear how extensive this project was.

With such an expansive project at hand, it was important to have an incomparable security system in place. With that in mind, VIS Systems provided some of our high quality equipment, including:


Take a look at another one of our nearby projects and find out how we assisted the Wirral Growth Hub stay safe during construction.

Wirral Growth Hub

This regeneration project between Muse – Morgan Sindall’s urban regeneration development arm – and Wirral Borough Council went ahead to redevelop the heart of Birkenhead town centre.

Contact us now to learn more about how we can help monitor your project or get a quote